BESS Mornington Peninsula Project: Turnkey Site Establishment


Location: Mornington Peninsula, Victoria
Project Year: 2024
Project Duration: 12 Months

Battery Energy Storage System (BESS)

Project Overview

The BESS project is a critical infrastructure initiative aimed at enhancing energy storage capabilities in the Mornington Peninsula region. This project required a fully integrated site compound solution to support two separate workforce locations on the same premises, ensuring efficiency, safety, and sustainability throughout the 12-month duration.

client

downer

Downer is a leading provider of integrated services across infrastructure, utilities, and engineering sectors in Australia and New Zealand. Their projects require reliable, efficient, and sustainable site solutions to support large-scale workforce operations.

Turnkey Site Establishment
Turnkey Site Establishment
Two distinct site locations on the same premises+
Required separate, yet integrated, site facilities for different workforce sizes.
Regional, remote location+
No existing infrastructure for shelter or workforce amenities.
Varying workforce sizes across both sites+
Needed scalable facilities to accommodate different crew sizes efficiently.
Weather exposure (Australian summer conditions)+
No existing shelter, putting workers at risk of heat stress.
Sustainability requirements+
Project mandated the use of biodiesel and other environmentally conscious site solutions.
Fast turnaround time+
Project deadlines required rapid deployment of site infrastructure and utilities.
Risk of septic tank overflows+
No existing wastewater infrastructure; required active liquid-level monitoring to prevent spills.
Plumbing and wastewater management+
Required seamless plumbing connections and ongoing waste management services.

RhinoSite’s Turnkey Solutions

As a specialist in end-to-end site establishment, RhinoSite provided a custom turnkey site compound solution tailored to Downer’s site requirements. Our scope included planning, installation, and ongoing service management to ensure a seamless, efficient, and compliant site setup.

Services Provided

✅ Site Planning & Establishment+
Designed a custom site layout to accommodate two workforce groups efficiently. Established separate facilities while ensuring streamlined operations between both locations.
✅ Walkway Cover Shelters+
Installed covered walkways and shelters to protect workers from extreme summer temperatures. Provided weatherproof, durable solutions to enhance worker safety and comfort.
✅ Temporary Facilities & Workforce Amenities+
Installed site offices, lunchrooms, change rooms, and ablution blocks tailored to workforce needs.
✅ Biodiesel-Powered Site Infrastructure+
Utilised biodiesel generators and sustainable energy solutions in compliance with Downer’s environmental commitments.
✅ Septic Tank Solutions & Liquid Level Alarms+
Installed septic tanks with automated liquid-level alarms to prevent overflow risks. Ensured ongoing waste management services to maintain site compliance.
✅ Plumbing Connections & Services+
Delivered complete plumbing and water supply solutions, ensuring seamless site functionality.
✅ Rapid Deployment & Project Management+
Successfully completed full site setup within the required fast turnaround timeframe. Managed logistics, procurement, and compliance, ensuring a hassle-free setup for Downer.

Results & Impact

1.Enhanced Workforce Safety & Comfort+
Workers benefited from weatherproof shelters and covered walkways, significantly reducing heat stress risks.
2.Sustainable Site Solutions+
The biodiesel-powered setup helped Downer meet its environmental goals while maintaining efficient site operations.
3.Operational Efficiency+
Seamless site services, including plumbing, waste management, and amenities, allowed Downer to focus on the core project without infrastructure concerns.
4.Risk Mitigation & Compliance+
The liquid-level alarm system ensured septic tank overflow risks were minimized, preventing potential environmental hazards.
5.Timely & Cost-Effective Deployment+
RhinoSite’s turnkey approach enabled fast, hassle-free site setup with minimal disruptions.

Why RhinoSite?

As a trusted provider of turnkey site compound solutions, RhinoSite simplifies complex site establishment needs with expert project management and a full-service approach. Our solutions ensure that large-scale infrastructure projects, like Downer’s BESS Mornington Peninsula, run smoothly and efficiently from day one

🔹 Integrated Site Planning – Custom solutions for multi-location projects



🔹 Workforce-Focused Facilities – Safe, compliant, and fully equipped site amenities



🔹 Sustainable Solutions – Environmentally friendly site infrastructure



🔹 Rapid Setup & Ongoing Support – Fast deployment with ongoing site servicing

For expert site establishment services tailored to your project’s needs, contact RhinoSite today!

    Related Case Studies

    Latest Case Studies

    Follow Us:

    RhinoSite

    At RhinoSite we take care of your site compound so you can focus on the real work. From site shed hire in Melbourne to ablution blocks in Ballarat, we plan, build and manage site compounds and site offices across Victoria. We whip up our innovative sites in a day, ready for you to get rolling on your project.

    © 2025 RhinoSite Pty. Ltd. All rights reserved. ABN: 68 651 327 178